Santa Candida II Thermal Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted the authorization to build and operate a 55-MW sugar-cane-residue fueled power plant located in the state of Minas Gerais. The sponsors created the following special purpose company to manage the project:
- Energisa Geracao Santa Candida II - UTE Santa Candida II
A 35-year authorization cont
- Status
- Prospective
- Sector
- Biomass, Commercial, Power Generation (CCGT), Steel, Geothermal, Government, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Santa Candida II Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted the authorization to build and operate a 55-MW sugar-cane-residue fueled power plant located in the state of Minas Gerais. The sponsors created the following special purpose company to manage the project: * Energisa Geracao Santa Candida II - UTE Santa Candida II A 35-year authorization contract was granted by the regulatory agency ANEEL in August 2014. By December 2014, the Brazilian company Geracao Bioeletricidade Holding S.A., a subsidiary of the Canadian group Brookfield, acquired the project from Energisa Geracao. In December 2013, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2018. The investment committed to the power plant was estimated at US$ 65.6 million (BRL 218.84 million). Construction works commenced in December 2014 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Commercial, Power Generation (CCGT), Steel, Geothermal, Government, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details