logo

Santa Candida II Thermal Power Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted the authorization to build and operate a 55-MW sugar-cane-residue fueled power plant located in the state of Minas Gerais. The sponsors created the following special purpose company to manage the project:

  • Energisa Geracao Santa Candida II - UTE Santa Candida II

A 35-year authorization cont

Status
Prospective
Sector
Biomass, Commercial, Power Generation (CCGT), Steel, Geothermal, Government, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Santa Candida II Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santa Candida II Thermal Power Plant” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted the authorization to build and operate a 55-MW sugar-cane-residue fueled power plant located in the state of Minas Gerais. The sponsors created the following special purpose company to manage the project: * Energisa Geracao Santa Candida II - UTE Santa Candida II A 35-year authorization contract was granted by the regulatory agency ANEEL in August 2014. By December 2014, the Brazilian company Geracao Bioeletricidade Holding S.A., a subsidiary of the Canadian group Brookfield, acquired the project from Energisa Geracao. In December 2013, the company had been granted power purchase agreements to sell electricity to distribution companies starting in 2018. The investment committed to the power plant was estimated at US$ 65.6 million (BRL 218.84 million). Construction works commenced in December 2014 and were nearly concluded by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Commercial, Power Generation (CCGT), Steel, Geothermal, Government, Manufacturing (Industrial)

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project