logo

Santa Carolina Small Hydro Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Carolina Geracao de Energia Ltda, a partnership of CRERAL - Cooperativa de Geracao de Energia e Desenvolvimento (30%) and Grupo Arbaza (70%), was granted the authorization to build a 10.5-MW small hydro power plant located in the municipalities of Andre Rocha and Muitos Capoes, state of Rio Grande do Sul. The power plant was named PCH Santa Carolina.

In January 2012, the c

Project Information FAQ

Project Information

5 Q
The project “Santa Carolina Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Carolina Geracao de Energia Ltda, a partnership of CRERAL - Cooperativa de Geracao de Energia e Desenvolvimento (30%) and Grupo Arbaza (70%), was granted the authorization to build a 10.5-MW small hydro power plant located in the municipalities of Andre Rocha and Muitos Capoes, state of Rio Grande do Sul. The power plant was named PCH Santa Carolina. In January 2012, the company signed a 30-year contract with the regulatory agency ANEEL allowing the company to build and operate the power plant. In August 2015, the company took part in a bidding process to establish 30-year power purchase agreements with electricity distribution companies. The company won the contracts by offering the tariff of US$ 68.2/MWh (BRL 203/MWh). The company agreed to commence operations in 2018. The investment was estimated at US$ 14.1 million (BRL 42 million). Construction works commenced in July 2013. As of June 2015, the construction works were in advanced stage. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. In 2011, the company applied for carbon credits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data