Santa Cruz Reliability Project North
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
UniSource Energy Services is developing a new transmission line to upgrade the existing single line to a looped system, providing greater reliability and increased capacity for economic growth in Santa Cruz County. The project will be completed in three phases, with all phases expected to be in service by 2030.
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Commercial
- Location
- Nogales, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Santa Cruz Reliability Project North
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | UniSource Energy Services is developing a new transmission line to upgrade the existing single line to a looped system, providing greater reliability and increased capacity for economic growth in Santa Cruz County. The project will be completed in three phases, with all phases expected to be in service by 2030. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Nogales |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
