logo

Santa Cruz Route 1 CAPM

Sector: Road • Location: Santa Cruz, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Proposed

The California Department of Transportation (Caltrans) proposes to rehabilitate 8.3 lane miles of flexible Class 2 pavement using Capital Preventive Maintenance strategies. Capital Preventative Maintenance strategies include but are not limited to digouts (repair of more distressed areas of pavement through partial depth replacement), profile grinding, cold planing 0.15 foot of pavement, and placi

Project Information FAQ

Project Information

5 Q
The project “Santa Cruz Route 1 CAPM” is an infrastructure initiative in the Road sector, located in Santa Cruz, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans) proposes to rehabilitate 8.3 lane miles of flexible Class 2 pavement using Capital Preventive Maintenance strategies. Capital Preventative Maintenance strategies include but are not limited to digouts (repair of more distressed areas of pavement through partial depth replacement), profile grinding, cold planing 0.15 foot of pavement, and placing 0.15 foot of Rubberized Hot Mix Asphalt overlay. The anticipated design life of the new pavement is 10 years. The roadway would be re-striped upon completion. The existing dike would be removed and replaced, and shoulder backing would be placed to manage erosion and weathering at the edge of the pavement. The project also proposes to remove nonstandard guardrails and install the Midwest Guardrail System with appropriate end treatments. Embankments would be modified as necessary to reflect the changes to the Midwest Guardrail System and terminal end features. Additionally, the project would replace 16 large signs and 14 small signs, upgrade 51 Americans with Disabilities Act curb ramps and replace 40, replace 0.10 lane mile of Class 2 bike lanes (from post mile 18.15 to post mile 18.25), add guide striping and signage for pedestrians and cyclists, and enhance the visibility of 40 crosswalks at 18 intersections. The project would create two new bus stops (on the northbound and southbound sides) at the intersection of State Route 1 and Western Drive. Ten bike box delineations would also be added at six intersections, and five pedestrian islands would be enhanced at three intersections.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data