logo
ProjectPlanned

Santa Monica Pier Bridge Replacement Project

Sector: Bridge • Location: Santa Monica, California, United States

Source: TipRanks

Replacement of the 85-year-old Colorado Avenue Bridge at Santa Monica Pier in California. The project is expected to start in the last quarter of 2025 and take 22 months to complete, with completion scheduled before the Los Angeles 2028 Summer Olympics.

Status
Prospective
Sector
Bridge
Location
Santa Monica, California, United States of America
Updated
22 Jul 2026
Source
TipRanks

ConstructChat

Ask ConstructChat about Santa Monica Pier Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santa Monica Pier Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Santa Monica, California, United States. Taiyo aggregates data on it from TipRanks.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the 85-year-old Colorado Avenue Bridge at Santa Monica Pier in California. The project is expected to start in the last quarter of 2025 and take 22 months to complete, with completion scheduled before the Los Angeles 2028 Summer Olympics.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

California

City

Santa Monica

Source

Source

TipRanks

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2025-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project