Santa Nella/Volta Water Quality Improvement Phase 2
Sector: Water Supply and Storage • Location: Santa Nella, California, United States of America
Source: Dodge USA
The majority of work consists of: construction of two (2) 750,000 gallon storage tanks, blending facility and pre-fabricated metal building, low-pressure pump station and pre-fabricated metal building, 15,000 gallon hydropneumatic tank, wrought iron site fencing and gates, access road, improvements to storm water detention basin, piping improvements, installation of generator, electrical instrumen
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Government, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Road, Commercial, Steel
- Location
- Santa Nella, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Santa Nella/Volta Water Quality Improvement Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The majority of work consists of: construction of two (2) 750,000 gallon storage tanks, blending facility and pre-fabricated metal building, low-pressure pump station and pre-fabricated metal building, 15,000 gallon hydropneumatic tank, wrought iron site fencing and gates, access road, improvements to storm water detention basin, piping improvements, installation of generator, electrical instrumentation and controls improvements, site grading and aggregate base resurfacing, demolition of exis... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Nella |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Road, Commercial, Steel |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
