logo

Santa Nella/Volta Water Quality Improvement Phase 2

Sector: Water Supply and Storage • Location: Santa Nella, California, United States of America

Source: Dodge USA

Project
Bidding

The majority of work consists of: construction of two (2) 750,000 gallon storage tanks, blending facility and pre-fabricated metal building, low-pressure pump station and pre-fabricated metal building, 15,000 gallon hydropneumatic tank, wrought iron site fencing and gates, access road, improvements to storm water detention basin, piping improvements, installation of generator, electrical instrumen

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Road, Government, Metal, Steel
Location
Santa Nella, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Santa Nella/Volta Water Quality Improvement Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Santa Nella/Volta Water Quality Improvement Phase 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Santa Nella, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The majority of work consists of: construction of two (2) 750,000 gallon storage tanks, blending facility and pre-fabricated metal building, low-pressure pump station and pre-fabricated metal building, 15,000 gallon hydropneumatic tank, wrought iron site fencing and gates, access road, improvements to storm water detention basin, piping improvements, installation of generator, electrical instrumentation and controls improvements, site grading and aggregate base resurfacing, demolition of exis...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Santa Nella

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Road, Government, Metal, Steel

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project