logo

Santa Rosa II Hydroelectric Plant

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

In April 2006, Brazilian Engevix Engenharia SA acquired a greenfield contract to build own and operate the Santa Rosa II hydroelectric plant in Rio de Janeiro State from France's SIIF. It was originally awarded by Aneel, Brazil’s power regulator, and the government of Rio de Janeiro state in 2002. The contract included a 20 year power purchasing agreement (ppa) to Electrobras, the Brazilian federa

Project Information FAQ

Project Information

4 Q
The project “Santa Rosa II Hydroelectric Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In April 2006, Brazilian Engevix Engenharia SA acquired a greenfield contract to build own and operate the Santa Rosa II hydroelectric plant in Rio de Janeiro State from France's SIIF. It was originally awarded by Aneel, Brazil’s power regulator, and the government of Rio de Janeiro state in 2002. The contract included a 20 year power purchasing agreement (ppa) to Electrobras, the Brazilian federal power holding company. The Santa Rosa hydroelectric plant was to be located between the cities of Bom Jardim and Cordeiro and had a capacity of 30 megawatts. In addition to the plant, a 69 kV transmission line with a six km extension was to be constructed. Santa Rosa SA was a Specific Purpose Enterprise (SPE) created by Engevix SA to construct and explore commercially the hydroelectric plant Santa Rosa II. Engevix SA specialized in engineering and project management in the following sectors: electric energy, gas, oil, steel, waste and water. The project required investment of US $50 million (108 million real) and reached financial closure in October, 2006 when Banco Nacional de Desenvolvimento Economico e Social (BNDES), the Brazilian national development bank, approved a US $37 million (80 million real) loan to finance the project. The remaining US $17 million (28 million real) was to be financed directly by Santa Rosa S/A. The BNDES financing was granted under the federal government’s renewable power incentive program, Proinfa. Proinfra was created by the Brazilian ministry of mines and energy to diversify Brazilian energy supply and expand its capacity by 3.3 thousand megawatts. Construction began in March 2006 and had an expected completion date of December 2007.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data