Santa Teresa 1MG Elevated Storage Tank
Bid results · New Mexico · Last reported Dec 2024
Source: Dodge USA
Santa Teresa 1.0 MG Elevated Storage Tank Dona Ana County, New Mexico The Project includes the following Work: 1. Furnishing, installing, and providing all labor and materials to construct a new 1-million-gallon composite elevated storage tank and appurtenances. 2. Furnishing, installing, and providing all labor and materials to install approximately 500 ft of 16-inch diameter potable water buried
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Raw Materials, Car parking, Commercial, Automotive
- Location
- Sunland Park, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Santa Teresa 1MG Elevated Storage Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Santa Teresa 1.0 MG Elevated Storage Tank Dona Ana County, New Mexico The Project includes the following Work: 1. Furnishing, installing, and providing all labor and materials to construct a new 1-million-gallon composite elevated storage tank and appurtenances. 2. Furnishing, installing, and providing all labor and materials to install approximately 500 ft of 16-inch diameter potable water buried piping, connection to the existing 16-inch water line. 3. Furnishing, installing, and providing ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Sunland Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Raw Materials, Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
