Santa Teresa Hydro Power Project
Sector: Hydro • Location: Guatemala
Source: World Bank Group
The Guatemalan company Multi Inversiones S.A. developed the 16.4-MW hydro power project located at Polochic River. The power plant was named Santa Teresa Central Hidroelectrica.
Construction works commenced in 2006 and were concluded in March 2012. The investment directed to the power plant as estimated at US$ 36 million.
The power plant was set to sell its output through Guatemala's national gr
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Guatemala
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Santa Teresa Hydro Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Guatemalan company Multi Inversiones S.A. developed the 16.4-MW hydro power project located at Polochic River. The power plant was named Santa Teresa Central Hidroelectrica. Construction works commenced in 2006 and were concluded in March 2012. The investment directed to the power plant as estimated at US$ 36 million. The power plant was set to sell its output through Guatemala's national grid (Sistema Nacional Interconectado). In January 2007, the project applied for carbon credit. |
Original sector | Energy |
Budget |
Location
Country | Guatemala |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
