logo

Santa Terezinha Tapejara Cogeneration Project

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

Santa Terezinha's project was a 50.5 MW bagasse power plant at Tapejara city, Parana state. The project was a cogeneration plant which agreed to sell 28 of the 50.5 MW to state owned Eletrobras through a 20- year power purchase contract. The contract was part of the Financial Support Program for Investments in Alternative Sources of Electric Energy (PROINFA). PROINFA was a government sponsored ren

Status
Prospective
Sector
Biomass, Wind, Government, Hydro, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Santa Terezinha Tapejara Cogeneration Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santa Terezinha Tapejara Cogeneration Project” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Santa Terezinha's project was a 50.5 MW bagasse power plant at Tapejara city, Parana state. The project was a cogeneration plant which agreed to sell 28 of the 50.5 MW to state owned Eletrobras through a 20- year power purchase contract. The contract was part of the Financial Support Program for Investments in Alternative Sources of Electric Energy (PROINFA). PROINFA was a government sponsored renewable energy program in which wind, biomass, and small hydro projects selected for development were guaranteed 20-year power purchase agreements with federal utility Eletrobras at pre-specified prices and receive access to BNDES financing. The project cost was estimated at US$59.3 million (163 million real). 61% of the cost was financed by a direct loan from Banco Nacional de Desenvolvimento Economico e Social (BNDES) and the remaining by the sponsor. Usina de Acucar Santa Terezinha Ltda was to add a modern boiler and new control equipment to an existing 13.2 MW electricity cogeneration power facility at its complex in order. The expansion and upgrade would allow the sponsor to achieve efficiency and reduce emissions from the operating plant that burned bagasse left over from processed sugar cane to produce energy. The power plant became operational in 2006.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Government, Hydro, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial)

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project