Santa Venetia TRB Maintenance
Sector: Water Supply and Storage • Location: California, United States of America
Source: Marin County Department of Public Works (DPW)
In 2024, TRB maintenance work is planned to be performed at a selection of high priority locations. This work will be led by the Marin County Department of Public Works’ Roads Maintenance Division. While a complete re-build of the levee is being pursued for Zone 7 (see the separate project here), the District will continue to perform annual maintenance of the TRB as much as the Zone 7 budget allow
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In 2024, TRB maintenance work is planned to be performed at a selection of high priority locations. This work will be led by the Marin County Department of Public Works’ Roads Maintenance Division. While a complete re-build of the levee is being pursued for Zone 7 (see the separate project here), the District will continue to perform annual maintenance of the TRB as much as the Zone 7 budget allows. The TRB was constructed about 40 years ago in response to flooding during the early 1980s. While the TRB reduces the flood risk for approximately 600 parcels in the community, the wooden box-style structure has exceeded its service life. The TRB has exposed sections and the earthen levee upon which it is built is experiencing erosion. This condition compromises the integrity of the structure and its capacity to reduce flooding. Approximately 98 parcels along Gallinas Creek in Flood Zone 7 (Santa Venetia) have timber-reinforced berms (TRB) along the levee to provide additional protection against high tides. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
