Santa Vitoria Thermal Power Plant
Sector: Geothermal • Location: Brazil
Source: World Bank Group
In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria.
Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria. Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a partnership of the investment funds FIP Ambiental, 26,4%; Rioforte Investment Holding, 26.2%; state-owned FI-FGTS, 26.2% and BNDES Participacoes, 20.5%). In July 2014, the contract was transferred to a newly created Project company named ERB MG Energias S.A. The value of the investment was estimated at US$ 82.4 million (BRL 245.2 millions). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The power plant won the public bidding that took place in April 2015, by offering an average tariff of US$ 91.4/MWh (BRL 272/MWh) for 25-year power purchase agreements with the several electricity distribution companies. Commercial operations of the power plant commenced in June 2015. In November 2015, the state-owned bank BNDES approved a US$ 10.5 million (BRL 35.1 million) loan to the project company. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
