Santa Vitoria Thermal Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria.
Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a p
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Government, Biomass
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Santa Vitoria Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria. Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a partnership of the investment funds FIP Ambiental, 26,4%; Rioforte Investment Holding, 26.2%; state-owned FI-FGTS, 26.2% and BNDES Participacoes, 20.5%). In July 2014, the contract was transferred to a newly created Project company named ERB MG Energias S.A. The value of the investment was estimated at US$ 82.4 million (BRL 245.2 millions). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The power plant won the public bidding that took place in April 2015, by offering an average tariff of US$ 91.4/MWh (BRL 272/MWh) for 25-year power purchase agreements with the several electricity distribution companies. Commercial operations of the power plant commenced in June 2015. In November 2015, the state-owned bank BNDES approved a US$ 10.5 million (BRL 35.1 million) loan to the project company. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Government, Biomass |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
