logo

Santa Vitoria Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria.

Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a p

Status
Prospective
Sector
Commercial, Geothermal, Power Generation (CCGT), Government, Biomass
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Santa Vitoria Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santa Vitoria Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 2013, the Brazilian company Santa Vitoria Acucar e Alcool Ltda was granted the 30-year authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Minas Gerais (124.2 MW in total capacity). The power plant was named UTE Santa Vitoria. Santa Vitoria Acucar e Álcool Ltda was established as a subsidiary of ERB - Energias Renováveis do Brasil S.A.(a partnership of the investment funds FIP Ambiental, 26,4%; Rioforte Investment Holding, 26.2%; state-owned FI-FGTS, 26.2% and BNDES Participacoes, 20.5%). In July 2014, the contract was transferred to a newly created Project company named ERB MG Energias S.A. The value of the investment was estimated at US$ 82.4 million (BRL 245.2 millions). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The power plant won the public bidding that took place in April 2015, by offering an average tariff of US$ 91.4/MWh (BRL 272/MWh) for 25-year power purchase agreements with the several electricity distribution companies. Commercial operations of the power plant commenced in June 2015. In November 2015, the state-owned bank BNDES approved a US$ 10.5 million (BRL 35.1 million) loan to the project company.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Power Generation (CCGT), Government, Biomass

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project