logo

Santafe I Water Supply and Sewerage Rehabilitation Project

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

Project
Closed

The key objective of the First Santa Fe Water Supply & Sewerage Rehabilitation Project is to support and consolidate the transition of Empresa de Acueducto y Alcantarillado de Bogota (EAAB) from a technically capable but operationally inefficient public service agency to a commercially-run public utility company, sensitive to the demands of the market, and with a corporate culture based on profess

Project Information FAQ

Project Information

5 Q
The project “Santafe I Water Supply and Sewerage Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The key objective of the First Santa Fe Water Supply & Sewerage Rehabilitation Project is to support and consolidate the transition of Empresa de Acueducto y Alcantarillado de Bogota (EAAB) from a technically capable but operationally inefficient public service agency to a commercially-run public utility company, sensitive to the demands of the market, and with a corporate culture based on professional responsibility and accountability. The project will enhance operational efficiency, provide broader managerial autonomy and responsibility, reduce political interference, and increase public accountability of municipal utilities such as EAAB. The transition to a corporate culture will prepare the way for a longer-term structural transformation of the company, including inter alia, participation of private sector capital in the future provision and operation of the capital's water and sewerage services. In addition, the project has a number of specific objectives which include: 1) expanding distribution services to the urban poor; 2) addressing major environmental concerns of the heavily polluted Bogota River; 3) reducing the vulnerability of the Bogota water supply system; 4) supporting a revamped economy and its tariff framework which enables EAAB to reflect the full cost of providing its services. The project includes eight main components: 1) vulnerability control; 2) primary sanitary and storm water drainage and pollution control; 3) primary water distribution system; 4) secondary water, sewerage and drainage networks and service connections; 5) rehabilitation works; 6) institutional strengthening of EAAB; 7) technical assistance and consulting services for engineering, design and supervision of works; and 8) environmental component.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data