Santafe I Water Supply and Sewerage Rehabilitation Project
Sector: Water Supply and Storage • Location: Colombia
Source: World Bank Group
The key objective of the First Santa Fe Water Supply & Sewerage Rehabilitation Project is to support and consolidate the transition of Empresa de Acueducto y Alcantarillado de Bogota (EAAB) from a technically capable but operationally inefficient public service agency to a commercially-run public utility company, sensitive to the demands of the market, and with a corporate culture based on profess
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The key objective of the First Santa Fe Water Supply & Sewerage Rehabilitation Project is to support and consolidate the transition of Empresa de Acueducto y Alcantarillado de Bogota (EAAB) from a technically capable but operationally inefficient public service agency to a commercially-run public utility company, sensitive to the demands of the market, and with a corporate culture based on professional responsibility and accountability. The project will enhance operational efficiency, provide broader managerial autonomy and responsibility, reduce political interference, and increase public accountability of municipal utilities such as EAAB. The transition to a corporate culture will prepare the way for a longer-term structural transformation of the company, including inter alia, participation of private sector capital in the future provision and operation of the capital's water and sewerage services. In addition, the project has a number of specific objectives which include: 1) expanding distribution services to the urban poor; 2) addressing major environmental concerns of the heavily polluted Bogota River; 3) reducing the vulnerability of the Bogota water supply system; 4) supporting a revamped economy and its tariff framework which enables EAAB to reflect the full cost of providing its services. The project includes eight main components: 1) vulnerability control; 2) primary sanitary and storm water drainage and pollution control; 3) primary water distribution system; 4) secondary water, sewerage and drainage networks and service connections; 5) rehabilitation works; 6) institutional strengthening of EAAB; 7) technical assistance and consulting services for engineering, design and supervision of works; and 8) environmental component. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
