Santo Abelardo Wind Farm
Sector: Wind • Location: Brazil
Source: World Bank Group
The project involves the construction of the 58MW Santo Abelardo wind farm, located in Caiçara do Rio do Vento, Rio Grande do Norte State, Brazil. Sponsors of the project are Casa dos Ventos (80%) and Perfin (20%). Total project cost is BRL 262.13m (USD 50.47m). BNDES provided a loan of BRL 204.33m (USD 39.34m). Financial close was achieved in December 2020. The wind farm is expected to be operati
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Commercial, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Santo Abelardo Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the 58MW Santo Abelardo wind farm, located in Caiçara do Rio do Vento, Rio Grande do Norte State, Brazil. Sponsors of the project are Casa dos Ventos (80%) and Perfin (20%). Total project cost is BRL 262.13m (USD 50.47m). BNDES provided a loan of BRL 204.33m (USD 39.34m). Financial close was achieved in December 2020. The wind farm is expected to be operational in March 2022. https://ijglobal.com/data/transaction/54340/santo-abelardo-wind-farm-58mw |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Commercial, Government |
Article published date | 2024-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
