Santo André water & waste O&M PPP project
Sector: Water Supply and Storage • Location: Brazil
Source: InfraPPPWorld
The concession involves the operation and maintenance (O&M) of Santo André water supply and wastewater systems. Additionally, the preferred bidder will be responsible for the O&M of the new water treatment plant currently under construction and for the management of the physical losses in the city's waterworks network.The concession contract will have a period of 35 years and its value is estimate
- Status
- Under Construction
- Sector
- Water Supply and Storage
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Santo André water & waste O&M PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The concession involves the operation and maintenance (O&M) of Santo André water supply and wastewater systems. Additionally, the preferred bidder will be responsible for the O&M of the new water treatment plant currently under construction and for the management of the physical losses in the city's waterworks network.The concession contract will have a period of 35 years and its value is estimated at R$600 million (US$150.8 million). |
Original sector | Water & Waste |
Procurement method |
Location
Country | Brazil |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
