logo

Santo Domingo de los Olleros TPP (Phase I)

Active · Lima

Source: World Bank Group

Project
Active

On January 4, 2010, Peru's ministry of energy and mines (MEM)authorized Termochilca to build, own, operate the 196 MW Santo Domingo de los Olleros Thermoelectric Power Plant in the Chilca district south of Lima. The plant was to be expanded in two additional phases to bring total capacity up to 600 MW through additional turbines and closing the cycle. The plant was to be built 60 km south of Lima,

Status
Prospective
Sector
Commercial, Natural Gas, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Lima, Peru
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Santo Domingo de los Olleros TPP (Phase I)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santo Domingo de los Olleros TPP (Phase I)” is an infrastructure initiative in the Commercial sector, located in Lima, Peru. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On January 4, 2010, Peru's ministry of energy and mines (MEM)authorized Termochilca to build, own, operate the 196 MW Santo Domingo de los Olleros Thermoelectric Power Plant in the Chilca district south of Lima. The plant was to be expanded in two additional phases to bring total capacity up to 600 MW through additional turbines and closing the cycle. The plant was to be built 60 km south of Lima, in the Chilca district, and use natural gas from the Camisea gas field. Termochilca was being developed by AME , but was wholly owned by Americas Energy Fund 1, a fund incorporated in Canada, but jointly managed by Chilean sponsors SCL Energía (50%) and Larrain Vial (50%). AME had an option to purchase up to 15% of the Termochilca project, which could be exercised during the first year of construction of the plant. In 2011, Termochilca awarded Siemens Energy a turnkey EPC contract for the plant. The order volume is around US$80mn and includes the supply of a SGT6-5000F gas turbine and SGEN6-1000A electric generator The total project cost was US $128.4 million. In December 2011, Termochilca signed a US$83.5 million, medium term debt agreement with Scotiabank. The debt to equity ratio was approximately 65:35. In 2012, CAF approved a credit guarantee for the project debt The project was expected to become operational in September 2013. Commercial operations commenced in October 2013.

Original sector

Energy

Budget

Location

Country

Peru

State

Lima

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Natural Gas, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-05-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project