logo

Santos-Guarujá Immersed Tunnel

Sector: Rail • Location: Santos and Guarujá, São Paulo, Brazil

Source: CPG Click Petróleo e Gás

Project
Contract Signing Phase

The Santos-Guarujá immersed tunnel is a 1.5-kilometer tunnel with 870 meters submerged under the Santos Port channel, connecting Macuco in Santos to Vicente de Carvalho in Guarujá. It includes six traffic lanes, a reversible lane for future Light Rail Vehicle operation, a bike lane, and a catwalk. The tunnel is designed to reduce travel time from up to an hour to approximately two minutes, improve

Status
Contract signing phase
Sector
Rail, Warehouse, Oil and Gas, Road, Tunnel, Cement, Government
Location
Santos and Guarujá, São Paulo, Brazil
Updated
22 Jul 2026
Source
CPG Click Petróleo e Gás

ConstructChat

Ask ConstructChat about Santos-Guarujá Immersed Tunnel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Santos-Guarujá Immersed Tunnel” is an infrastructure initiative in the Rail sector, located in Santos and Guarujá, São Paulo, Brazil. Taiyo aggregates data on it from CPG Click Petróleo e Gás.

Participants

Sponsoring Agency

Company

Status

Original status

contract signing phase

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Santos-Guarujá immersed tunnel is a 1.5-kilometer tunnel with 870 meters submerged under the Santos Port channel, connecting Macuco in Santos to Vicente de Carvalho in Guarujá. It includes six traffic lanes, a reversible lane for future Light Rail Vehicle operation, a bike lane, and a catwalk. The tunnel is designed to reduce travel time from up to an hour to approximately two minutes, improve mobility and logistics in the Baixada Santista region, and reduce carbon dioxide emissions by up to 53%. The project is a Public-Private Partnership (PPP) with a 30-year contract, involving public investments of R$5.4 billion and private investments of R$1.78 billion. The construction involves six precast reinforced concrete modules, each about 140 meters long, built in a dry dock and submerged in the riverbed.

Original sector

Construction

Budget

Location

Country

Brazil

State

São Paulo

City

Santos and Guarujá

Source

Source

CPG Click Petróleo e Gás

URL

More Details

Record type

Project

Sector

Rail, Warehouse, Oil and Gas, Road, Tunnel, Cement, Government

Article published date

2025-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project