Sany Timiș Green Energy and Data Centre Project
Sector: Solar • Location: Timișoara, Timiș County, Romania
Source: Intellinews
Sany Group plans to invest over €1bn in a hybrid energy and data centre project in western Romania, including solar parks with 2.8 GWp capacity, a 2.34 GWh battery energy storage system, and a data centre with 70 MW IT load. The project will be located in Uivar and Timișoara, with solar installations in Uivar and storage and data centre in Timișoara.
- Status
- Prospective
- Sector
- Solar, Energy Storage, Data Center
- Location
- Timișoara, Timiș County, Romania
- Updated
- 22 Jul 2026
- Source
- Intellinews
ConstructChat
Ask ConstructChat about Sany Timiș Green Energy and Data Centre Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sany Group plans to invest over €1bn in a hybrid energy and data centre project in western Romania, including solar parks with 2.8 GWp capacity, a 2.34 GWh battery energy storage system, and a data centre with 70 MW IT load. The project will be located in Uivar and Timișoara, with solar installations in Uivar and storage and data centre in Timișoara. |
Original sector | Energy and Data Centre |
Budget |
Location
Country | Romania |
State | Timiș County |
City | Timișoara |
Source
Source | Intellinews |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Data Center |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Romania
- Stada Arzneimittel Supply Chain and Packaging Facility, Turda, Romania
- Project Batar
- Beta Solar PV Park
- Romania UCEA Solar PV Park
- Alpha Solar PV Park
- Transport infrastructure rehabilitation in the Ungheni-Iasi cross-border area which aims at traffic streamline in the Sculeni border crossing point - 3,1,1 valori 3 indicatori neprecizati
- Green economy for greener local communities in Danube area
- Montana – Dolj : Better access-closer communities
