logo

Sao Domingos II Hydro Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Santa Cruz Power Corporation Usinas Hidroeletricas S.A., a wholly-owned subsidiary of the American company Contour Global, was granted an authorization by the regulatory agency ANEEL to build a small hydro power plant located in the state of Goiás (24.3 MW in total capacity).

In November 2001, Santa Cruz Power Corporation Usinas Hidroeletricas S.A. signed a 30-year contr

Project Information FAQ

Project Information

5 Q
The project “Sao Domingos II Hydro Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Santa Cruz Power Corporation Usinas Hidroeletricas S.A., a wholly-owned subsidiary of the American company Contour Global, was granted an authorization by the regulatory agency ANEEL to build a small hydro power plant located in the state of Goiás (24.3 MW in total capacity). In November 2001, Santa Cruz Power Corporation Usinas Hidroeletricas S.A. signed a 30-year contract with ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. In June 2006, the company took part in a competitive bidding process to sell electricity to the regulated wholesale market (15-year power purchase agreement was signed guaranteeing the sale of 21 MW of electricity to the national grid). Santa Cruz Power Corporation Usinas Hidroelétricas S.A. committed to invest US$ 67.5 million (BRL 135 million) in the facility. Construction works started in and were in advanced stages in early 2009, but the sponsor could not raise enough resources to finish the works until December 2009, when the company was granted a US$ 20.4 million (BRL 40.8 million) loan contract from BNDES, a state-owned development bank. This funding was directed to the construction of the substation and the transmission line to connect the power plant to the national grid. Commercial operations commeced in June 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data