logo

Sao Goncalo do Amarante Airport

Sector: Airport • Location: Brazil

Source: World Bank Group

Project
Active

In August 2011, Consorcio Inframerica was awarded in a competitive bidding process the contract to build and operate the airport located at the city of Sao Goncalo do Amarante (near Natal, the capital of the state of Rio Grande do Norte). Consorcio Inframerica was established as a partnership of the Brazilian company Infravix Participacoes (50%) - a subsidiary of Grupo Engevix - and the Argentine

Project Information FAQ

Project Information

5 Q
The project “Sao Goncalo do Amarante Airport” is an infrastructure initiative in the Airport sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In August 2011, Consorcio Inframerica was awarded in a competitive bidding process the contract to build and operate the airport located at the city of Sao Goncalo do Amarante (near Natal, the capital of the state of Rio Grande do Norte). Consorcio Inframerica was established as a partnership of the Brazilian company Infravix Participacoes (50%) - a subsidiary of Grupo Engevix - and the Argentine company Corporacion America (50%). A special purpose company named Inframerica Concessionaria do Aeroporto de Sao Goncalo do Amarante was created to manage the project, 51% owned by Consorcio Inframerica and 49% owned by the state-owned company Infraero. The 28-year contract was signed with the regulatory agency in November 2011. Besides Consorcio Inframerica, three other companies took part in the contest: Consorcio ATP-Contratec, Consorcio Aeroportos Brasil and Aeroleste Potiguar (a partnership of the Brazilian company Triunfo and the Spanish company FCC). The bidding criteria set by the regulatory agency ANAC was the highest payment for the concession rights. Consorcio Inframerica presented the highest offer, a total value of US$ 104.2 million (BRL 170 billion), 329% above the minimum set by the regulatory agency. The payments were set to be made in annual installments over the life of the contract. The airport was set to have a total capacity of 6.2 million passengers per year. The total investment in the project was estimated at US$ 205 million (BRL 400 million), and was financed with a US$ 169 million (BRL 330 million) loan from the state-owned bank BNDES granted in December 2012. Commercial operations commenced in May 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data