Sao Jose da Estiva Biomass Plant

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

The company Usina Sao Jose da Estiva S.A. Acucar e Alcool, a wholly-owned subsidiary of the Brazilian group W.J. de Biasi, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (42.5 MW in total capacity).

The 30-year contract was signed with the regulatory agency ANEEL in April 2000. The sponsor created a special purpose com

Status
Prospective
Sector
Steel, Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sao Jose da Estiva Biomass Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sao Jose da Estiva Biomass Plant” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company Usina Sao Jose da Estiva S.A. Acucar e Alcool, a wholly-owned subsidiary of the Brazilian group W.J. de Biasi, was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (42.5 MW in total capacity). The 30-year contract was signed with the regulatory agency ANEEL in April 2000. The sponsor created a special purpose company named UTE Sao Jose da Estiva S.A. to manage the project. The power plant was initially established as a captive unit, but only in 2000 it received the approval from the regulatory agency to expand capacity and to sell electricity to the grid. The power plant had initially a capacity of 6.9 MW, which was expanded to 19.5 MW in 2002. In 2009, the sponsor received another authorization to expand its capacity to 42.5 MW, allowing a greater amount of electricity to be exported to the national grid. As of February 2012, construction works were concluded. The value of the investment committed to the project was not available. The electricity produced with the expansion of the capacity was set to be sold under two power purchase agreements: the first with the electricity distribution company CEMAT, valid until 2016, and the second with Grupo Rede, valid until 2022. Additionally, any energy surplus not sold was set to be negotiated in the free market with purchasers not yet established. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Biomass, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project