Sao Jose Hydro Power Plant
Sector: Commercial • Location: Rio Grande Do Sul, Brazil
Source: World Bank Group
In December 2005, the Brazilian company Alupar Investimento was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 51-MW hydro power plant located in the Ijui River, state of Rio Grande do Sul. Besides Alupar, two other Brazilian companies took part in the bidding contest: Fuad Rassi and state-owned Eletrosul.
T
- Status
- Prospective
- Sector
- Commercial, Hydro, Power Generation (CCGT), Government
- Location
- Rio Grande Do Sul, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sao Jose Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2005, the Brazilian company Alupar Investimento was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 51-MW hydro power plant located in the Ijui River, state of Rio Grande do Sul. Besides Alupar, two other Brazilian companies took part in the bidding contest: Fuad Rassi and state-owned Eletrosul. The bidding criteria set by the federal regulatory agency ANEEL was the lowest tariff. The company also agreed to pay US$ 0.085 million (BRL 0.155 million) in yearly installments during the life of the contract, starting once operations commence (using a discount rate of 10%, the present value of this contribution was estimated at US$ 24 million). The contract was signed in July 2006, and sponsors created the company Ijui Energia to lead the project during the 35-year contract period. All the electricity produced was set to be sold to distribution companies. In September 2008, the state-owned investment fund FI-FGTS acquired 49.99% of the project company's shares. The sponsor committed to invest US$ 184.5 million (BRL 337.6 million) in the power plant. Financial closure was achieved in April 2008, when the sponsor was granted a US$ 91.9 million (BRL 168.2 million) loan from BNDES. The remaining cost was financed with the sponsors’ internal resources. Construction works started in September 2007, and operations commenced in March 2011. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Rio Grande Do Sul |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Hydro, Power Generation (CCGT), Government |
Article published date | 2024-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
