Sao Paulo flood control PPP
One of 10,000+ projects Taiyo tracks in Brazil.
Source: InfraPPPWorld
The object of PPP involves the expansion, modernization, operation and maintenance of 45 (forty five) storage tanks, seven (7) to be deployed in public areas in need of tamponade, eight (8) already being implemented by DAEE to be modernized through automation and integration, and thirty (30) to be recovered through existing general reform, dredging and proper disposal of sediments.
- Status
- Failure
- Sector
- Water Supply and Storage
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Sao Paulo flood control PPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project canceled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The object of PPP involves the expansion, modernization, operation and maintenance of 45 (forty five) storage tanks, seven (7) to be deployed in public areas in need of tamponade, eight (8) already being implemented by DAEE to be modernized through automation and integration, and thirty (30) to be recovered through existing general reform, dredging and proper disposal of sediments. |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
