Sao Paulo Metro Line 4 Project
Sector: Mass Transit • Location: Brazil
Source: World Bank Group
The Sao Paulo Metro - Line 4 - Project aims to improve the quality, and sustainability of urban transport in the Sao Paulo Metropolitan Region, by interconnecting the existing subway, commuter rail, and bus networks through the construction of the metro's Line 4. The project's two components consist of: 1) an infrastructure, and equipment investment component (Part A), to build the metro's line 4,
- Status
- Closed
- Sector
- Mass Transit, Road, Rail, Power Generation (CCGT), Tunnel, Commercial, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sao Paulo Metro Line 4 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sao Paulo Metro - Line 4 - Project aims to improve the quality, and sustainability of urban transport in the Sao Paulo Metropolitan Region, by interconnecting the existing subway, commuter rail, and bus networks through the construction of the metro's Line 4. The project's two components consist of: 1) an infrastructure, and equipment investment component (Part A), to build the metro's line 4, which includes transfer stations between road, and rail based systems. A turnkey contract - concession or other arrangement - will cover civil works, encompassing the underground track, transfer stations between the metro, commuter rail, buses, autos, and non-motorized transport. System wide facilities will include electrical power systems, and traction power substations for power distribution in the tunnel, illumination, and ventilation systems, among other facilities. A rolling stock will comprise a fleet of train-sets to operate this line, with additional train-sets to complete the operation, under the second phase; and, 2) a technical assistance component (Part B) to support, and finance the project management oversight consultant who will assist the project coordination unit, with supervision, and the goods financed under the project. A financial management cost recovery study - with recommendations on tariff structure - will be included, as will a follow-up on project finance studies. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Rail, Power Generation (CCGT), Tunnel, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
