logo
ProjectClosed

Sao Paulo Metro Line 5 Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The objective of the Sao Paulo Metro Line 5 Project for Brazil is to improve the mobility of public transport users in the Capao Redondo-Largo Treze Chacara Klabin corridor in a cost-efficient and environmentally-friendly manner. The components of the project include: extending the existing Line 5 by approximately 12 km from the southwest of the city to the expanded center by 2013 and will be co-f

Status
Closed
Sector
Mass Transit, Rail, Tunnel, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sao Paulo Metro Line 5 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sao Paulo Metro Line 5 Project” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Sao Paulo Metro Line 5 Project for Brazil is to improve the mobility of public transport users in the Capao Redondo-Largo Treze Chacara Klabin corridor in a cost-efficient and environmentally-friendly manner. The components of the project include: extending the existing Line 5 by approximately 12 km from the southwest of the city to the expanded center by 2013 and will be co-financed by the State of Sao Paulo, International Bank for Reconstruction and Development (IBRD), and the Inter American Development Bank (IADB). The state will fully finance all the civil works and permanent way as well as its project management and supervision. IADB will finance in full the modernization of 8 trains which already operate in the existing line 5 and will partially finance with the state the energy supply, the telecommunications and control system, the auxiliary systems and the low-income population impact studies for a total of US$481 million. The IBRD will finance the acquisition and supervision of delivery and implementation of 26 new trains, the Communication Based Train Control (CBTC) signaling system and platform screen doors and climate change related studies for a total of US$650.4 million. After the extension, the line will consist of a 20.1 km metro line going from Capdo Redondo station to Chcicara Klabin station and including the 15 intermediate stations.

Original sector

FY17 - Transportation

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Tunnel, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project