logo
ProjectClosed

SAO PAULO POLLUT CTL

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The project would be the first concerted effort to reduce air and water pollution in the Greater Sao Paulo area. It would provide financing for existing industries to carry out air pollution control subprojects to reduce particular matter emissions and water pollution control subprojects to pretreat or fully treat their liquid effluents. The project would primarily improve air quality in the Great

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SAO PAULO POLLUT CTL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SAO PAULO POLLUT CTL” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project would be the first concerted effort to reduce air and water pollution in the Greater Sao Paulo area. It would provide financing for existing industries to carry out air pollution control subprojects to reduce particular matter emissions and water pollution control subprojects to pretreat or fully treat their liquid effluents. The project would primarily improve air quality in the Greater Sao Paulo area and reduce the discharge of toxic substances and organic materials into water bodies. The project also includes technical assistance to strengthen the technical and operational capability of the environmental protection agency of the state of Sao Paulo, which would be responsible for technical appraisal and supervision of subprojects. The project would contribute to improving the health and living conditions of the population, particularly of the urban poor. The main risk faced by the project relates to the negative internal financial rates of return of most pollution control investments. Opposition by industrialists to such investments could slow down project execution. The financial incentives included as part of the project and the penalties included in the legislation would reduce this risk to an acceptable level.

Original sector

(Historic)Environment

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project