The Brazilian company Sao Sebastiao Empreeendimentos S.A. was granted the authorization to build a small hydro power plant (PCH Sao Sebastiao) located in the state of Santa Catarina (9.9 MW in total capacity). The 30-year contract was signed with the regulatory agency ANEEL in March 2011.

Sao Sebastiao Empreeendimentos committed to invest US$ 24.1 million (BRL 47.63 million) in the construct

Status
Prospective
Sector
Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sao Sebastiao Small Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sao Sebastiao Small Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Sao Sebastiao Empreeendimentos S.A. was granted the authorization to build a small hydro power plant (PCH Sao Sebastiao) located in the state of Santa Catarina (9.9 MW in total capacity). The 30-year contract was signed with the regulatory agency ANEEL in March 2011. Sao Sebastiao Empreeendimentos committed to invest US$ 24.1 million (BRL 47.63 million) in the construction of the Sao Sebastiao power plant. In August 2010, the power plant took part in the competitive bidding process to sell electricity to the regulated wholesale market starting in 2013 (20-year power purchase agreement was signed guaranteeing the sale of electricity to the national grid). The tariff offered in the bidding process by the power plant was US$ 67.5/MWh (BRL 133.25/MWh). As of October 2012, the construction works were underway, and operations were expected to commence in 2013. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In September 2010, the company applied for carbon credits.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project