logo
ProjectProject In Operation

Sao Simao hydropower PPP Project

One of 10,000+ projects Taiyo tracks in Brazil.

Source: InfraPPPWorld

The dam's power station is located on the Paranaíba River near São Simão in Goiás/Minas Gerais, Brazil. The project involves six 285MW generators powered by Francis turbines for a total installed capacity of 1,710 MW.

Status
Under Construction
Sector
Power Generation (CCGT), Hydro, Government
Location
Brazil
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Sao Simao hydropower PPP Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sao Simao hydropower PPP Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in operation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The dam's power station is located on the Paranaíba River near São Simão in Goiás/Minas Gerais, Brazil. The project involves six 285MW generators powered by Francis turbines for a total installed capacity of 1,710 MW.

Original sector

Energy

Procurement method

Location

Country

Brazil

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project