logo

Sao Tome and Principe - Second road maintenance project

Sector: Raw Materials • Location: Sao Tome and Principe

Source: African Development Bank (AfDB)

Project

The second road maintenance project (PER2) was recommended by the study of the Road Plan (RP) carried out under the first road maintenance project (PER1) with ADF funding. The roads included in the project are extensions of the country’s most important roads, namely National Road 1 in the North-East and National Road 2, in the South-East. These extensions are situated in the districts of Caue and

Project Information FAQ

Project Information

4 Q
The project “Sao Tome and Principe - Second road maintenance project” is an infrastructure initiative in the Raw Materials sector, located in Sao Tome and Principe. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The second road maintenance project (PER2) was recommended by the study of the Road Plan (RP) carried out under the first road maintenance project (PER1) with ADF funding. The roads included in the project are extensions of the country’s most important roads, namely National Road 1 in the North-East and National Road 2, in the South-East. These extensions are situated in the districts of Caue and Lemba, which therefore constitute the project’s direct service area. The letter covers an area of about 500 km, i.e. 58% of that of the island of Sao Tome. Considering the smallness of the island, the project’s enlarged service area extends to all the island of Sao Tome (859 km2). The expected results are (i) the improvement of the state of the RN over 18 km between Neves and Santa Catarina and the RN2 over 4 km between Angolares and Ribeira Peixe by renewing the wearing course, (ii) the rehabilitated RN2 over 15 km between Ribeira Peixe and Porto Alegre and (iii) 29 rehabilitated structures on the RN1 and RN2. Socially, the project will contribute to the fight against rural exodus, to a better use of the existing infrastructure along the project roads and in Sao Tome and in improving the income of the rural populations of the districts of Caue and Lemba.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data