Sao Tome and Principe - Second road maintenance project
Sector: Raw Materials • Location: Sao Tome and Principe
Source: African Development Bank (AfDB)
The second road maintenance project (PER2) was recommended by the study of the Road Plan (RP) carried out under the first road maintenance project (PER1) with ADF funding. The roads included in the project are extensions of the country’s most important roads, namely National Road 1 in the North-East and National Road 2, in the South-East. These extensions are situated in the districts of Caue and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The second road maintenance project (PER2) was recommended by the study of the Road Plan (RP) carried out under the first road maintenance project (PER1) with ADF funding. The roads included in the project are extensions of the country’s most important roads, namely National Road 1 in the North-East and National Road 2, in the South-East. These extensions are situated in the districts of Caue and Lemba, which therefore constitute the project’s direct service area. The letter covers an area of about 500 km, i.e. 58% of that of the island of Sao Tome. Considering the smallness of the island, the project’s enlarged service area extends to all the island of Sao Tome (859 km2). The expected results are (i) the improvement of the state of the RN over 18 km between Neves and Santa Catarina and the RN2 over 4 km between Angolares and Ribeira Peixe by renewing the wearing course, (ii) the rehabilitated RN2 over 15 km between Ribeira Peixe and Porto Alegre and (iii) 29 rehabilitated structures on the RN1 and RN2. Socially, the project will contribute to the fight against rural exodus, to a better use of the existing infrastructure along the project roads and in Sao Tome and in improving the income of the rural populations of the districts of Caue and Lemba. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
