Sapphire Jhampir Wind Farm
Sector: Cable car • Location: Pakistan
Source: World Bank Group
Sapphire Wind Power Company Pvt. Ltd. was planning the development of a 50MW Wind Farm, Jhampir, Sindh Province.The project sponsors were Sapphire Textile Mills Limited and Bank Alfalah Limited, both companies organized under the laws of Pakistan.
The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. In October 2011, the
- Status
- Prospective
- Sector
- Cable car, Wind, Government, Power Generation (CCGT), Raw Materials, Automotive, Commercial, Manufacturing (Industrial), Telecommunications
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sapphire Jhampir Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sapphire Wind Power Company Pvt. Ltd. was planning the development of a 50MW Wind Farm, Jhampir, Sindh Province.The project sponsors were Sapphire Textile Mills Limited and Bank Alfalah Limited, both companies organized under the laws of Pakistan. The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. In October 2011, the company was seeking government approval to construct the wind farm. No tariff had been set by the NEPRA, but Sapphire has requested a tariff in August 2011. The feasibility study had been submitted. The EPC contract was awarded to CMEC, from China. The O&M contract was signed with GE, for a period of 10 years. 1372 acres of land were assigned to the company by AEDB. Incentives for the project included: Attractive tariff (cost plus 17% ROE, inflation and exchange rate protected) No import duties on equipment Exemption on income tax/withholding tax and sales tax Permission to issue corporate registered bonds Project cost was estimated at US$ 127.7mn. Financing included a 12-year term loan of $95mn provided by OPIC approved in March 2013. The term loan had a grace period of 2 years and repayment schedule of 10 years.The project had already registered for carbon credits from UNFCC. http://www.sapphire.com.pk/Pdf/cstman_dir_report.pdf Source: Renewable Energy Report: Pakisatn agency issues proposal to create feed-in tariff for wind energy production (31 October 2011) |
Original sector | Energy |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Cable car, Wind, Government, Power Generation (CCGT), Raw Materials, Automotive, Commercial, Manufacturing (Industrial), Telecommunications |
Article published date | 2024-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
