logo

Sapphire Jhampir Wind Farm

Sector: Cable car • Location: Pakistan

Source: World Bank Group

Project
Active

Sapphire Wind Power Company Pvt. Ltd. was planning the development of a 50MW Wind Farm, Jhampir, Sindh Province.The project sponsors were Sapphire Textile Mills Limited and Bank Alfalah Limited, both companies organized under the laws of Pakistan.

The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. In October 2011, the

Status
Prospective
Sector
Cable car, Wind, Government, Power Generation (CCGT), Raw Materials, Automotive, Commercial, Manufacturing (Industrial), Telecommunications
Location
Pakistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sapphire Jhampir Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sapphire Jhampir Wind Farm” is an infrastructure initiative in the Cable car sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sapphire Wind Power Company Pvt. Ltd. was planning the development of a 50MW Wind Farm, Jhampir, Sindh Province.The project sponsors were Sapphire Textile Mills Limited and Bank Alfalah Limited, both companies organized under the laws of Pakistan. The equipment supply contract was awarded to GE, from the USA. GE would supply turbines of the type GE 1.5-MW XLE, of 1.5MW each. In October 2011, the company was seeking government approval to construct the wind farm. No tariff had been set by the NEPRA, but Sapphire has requested a tariff in August 2011. The feasibility study had been submitted. The EPC contract was awarded to CMEC, from China. The O&M contract was signed with GE, for a period of 10 years. 1372 acres of land were assigned to the company by AEDB. Incentives for the project included: Attractive tariff (cost plus 17% ROE, inflation and exchange rate protected) No import duties on equipment Exemption on income tax/withholding tax and sales tax Permission to issue corporate registered bonds Project cost was estimated at US$ 127.7mn. Financing included a 12-year term loan of $95mn provided by OPIC approved in March 2013. The term loan had a grace period of 2 years and repayment schedule of 10 years.The project had already registered for carbon credits from UNFCC. http://www.sapphire.com.pk/Pdf/cstman_dir_report.pdf Source: Renewable Energy Report: Pakisatn agency issues proposal to create feed-in tariff for wind energy production (31 October 2011)

Original sector

Energy

Budget

Location

Country

Pakistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Cable car, Wind, Government, Power Generation (CCGT), Raw Materials, Automotive, Commercial, Manufacturing (Industrial), Telecommunications

Article published date

2024-05-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project