Sarad Pump Station
Sector: Water Supply and Storage • Location: Lost Hills, California, United States of America
Source: Dodge USA
Lost Hills Water District Reservoirs 1A and 3 were built with asphalt slope protection and clayey soil bottoms in 1968 during construction of the original distribution system. In general, the Work consists of dewatering standing water, removal of soft sediment with high organics, site preparation/earthwork, and lining Reservoirs 1A and 3 with geomembrane.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Lost Hills, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sarad Pump Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lost Hills Water District Reservoirs 1A and 3 were built with asphalt slope protection and clayey soil bottoms in 1968 during construction of the original distribution system. In general, the Work consists of dewatering standing water, removal of soft sediment with high organics, site preparation/earthwork, and lining Reservoirs 1A and 3 with geomembrane. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lost Hills |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
