logo

SARAJEVO AIR POLL. CNTRL

Sector: Manufacturing (Industrial) • Location: Yugoslavia, former

Source: World Bank Group

Project
Closed

The Sarajevo Air Pollution Control Project will provide the facilities needed to abate air pollution in Sarajevo. A natural gas transmission and distribution system will be installed and heating units will be converted to burn gas. Essential features of the project are: (i) construction of about 265 km of natural gas transmission line from Batajnica (near Belgrade) via Zvornik to Sarajevo includin

Project Information FAQ

Project Information

5 Q
The project “SARAJEVO AIR POLL. CNTRL” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Yugoslavia, former. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sarajevo Air Pollution Control Project will provide the facilities needed to abate air pollution in Sarajevo. A natural gas transmission and distribution system will be installed and heating units will be converted to burn gas. Essential features of the project are: (i) construction of about 265 km of natural gas transmission line from Batajnica (near Belgrade) via Zvornik to Sarajevo including pressure and regulating stations, (ii) construction of about 28km of high pressure distribution pipeline and metering substations to supply four industrial consumers, (iii) construction of 20 km of distribution ring, about 50 pressure regulating stations, about 160 km of service lines and related control system and spare parts, (iv) conversion of about 300 central heating plants and installation of about 10,000 house connections, and (v) technical assistance for the preparation of final design and tender documents, supervision of construction, staff training and tariff study.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data