Sarajevo International Airport

Sector: Aerospace & Defense • Location: Bosnia and Herzegovina

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

The EBRD is considering providing a loan of up to €25 million to Sarajevo International Airport (‘SIA’). The loan will finance an extension of the passenger terminal, together with upgrading and expanding the taxiway and apron. The investments are required to meet the growing passenger traffic at the international airport. In addition, measures to enhance the participation of the private sector in

Project Information FAQ

Project Information

4 Q
The project “Sarajevo International Airport” is an infrastructure initiative in the Aerospace & Defense sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing a loan of up to €25 million to Sarajevo International Airport (‘SIA’). The loan will finance an extension of the passenger terminal, together with upgrading and expanding the taxiway and apron. The investments are required to meet the growing passenger traffic at the international airport. In addition, measures to enhance the participation of the private sector in the operations of SIA will be introduced. The Bank has a long-standing relationship with Sarajevo International Airport and has contributed to the creation of SIA as a limited liability company owned by the Federation of Bosnia and Herzegovina. As part of the current project, the Bank will support measures that increase the participation of the private sector in the airport’s operations through the outsourcing of selected activities to private companies. In addition, the Bank will assist SIA in increasing the share of non-aviation revenues such as duty free areas, catering, business lounges and car parking. Finally, the project will include support for the EU’s Open Skies Policy. Sarajevo Airport d.o.o (‘SIA’) is an airport operator responsible for the management of Sarajevo International Airport. It is the main airport in Bosnia and Herzegovina, which has been in existence since 1969. SIA is a limited liability company, wholly owned by the Federation of Bosnia and Herzegovina. A sovereign guaranteed loan to SIA in an amount of up to €25 million. The total project is €31.9 million. Screening category Since the potential adverse environmental and social impacts that may result from the project are typically site-specific, readily identified, and can be mitigated through mitigation measures, the project has been categorised B in accordance with the EBRD Environmental and Social Policy (2008). Summary of issues & outcomes of due diligence An environmental, health and safety (EHS) audit of the existing facilities and an environmental and social analysis of the proposed project have been carried out by independent consultants as part of the Master Plan development. EBRD environmental specialist also visited the site together with the consultants. The results of the due diligence indicates that the current EHS performance of the airport is satisfactory, however, there are areas which can be further improved. The main areas for improvement are noise in the administrative building; oily water management; waste management; hazardous materials handling; improvement of the sewerage system; monitoring (air emissions, wastewater, noise). The current position of the fuel storage area is inappropriate for safety reasons and it is recommended to relocate it as soon as possible. The proposed project is expected to result in a number of environmental impacts. However, these impacts will be localised and not be significant. The main issues will be dust, air emissions from vehicles and equipment, increase in traffic, waste, and noise during construction; discharges of storm water mixed with oil and de-icing fluids; and potential spills from aviation fuelling (apron) and fuel tanks during operation. All such potential impacts can be addressed through the mitigation measures identified during the environmental analysis. Given that the extension to the terminal building and apron as well as the system upgrades will be constructed within the boundaries of an existing airport, the project will not cause any significant additional community health issues. SIA has signed an agreement with the municipality of Ilidza (local community) that regulates preparation of a spatial plan and other development plans. There is a problem of illegal and unlawful construction in this area, but some of the existing houses near the airport had been legitimised during the preparation of the prior spatial plan. SIA has developed and implemented a Safety Management System comprising safety procedures, risk management, emergency planning, investigating and reporting on accidental and incidental situations. All procedures within Safety Management System have been prepared in accordance with the regulatory and ICAO requirements. Summary of ESAP An Environmental and Social Action Plan has been developed and agreed with SIA. The main actions in the ESAP are as below: Project monitoring required The company will carry out regular monitoring of waste water discharges, air emissions and noise. The monitoring of the Bank will be conducted through the review of the Annual Environmental and Social Reports that will be presented by the Company. Site visits will be carried out by EBRD staff, if deemed necessary. Information disclosure & stakeholder engagement A Stakeholder Engagement Plan (SEP) including a grievance mechanism has been developed and communicated to the public. A summary of the ESAP and the SEP has been disclosed at the following locations:

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data