Sarajevo Urban Roads Development Project
Sector: Road
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering providing a sovereign loan for the benefit of Sarajevo Canton to co-finance the construction of road infrastructure works on sections of the 12th Transversal Road (0.9km) and Southern Longitudinal Road (2.4 km).
This is the first phase, estimated to cost €16.5 million, of a broader capital investment plan for the urban road infrastructure which also includes construction
- Status
- Under Construction
- Sector
- Road, Commercial, Residential
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Sarajevo Urban Roads Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The EBRD is considering providing a sovereign loan for the benefit of Sarajevo Canton to co-finance the construction of road infrastructure works on sections of the 12th Transversal Road (0.9km) and Southern Longitudinal Road (2.4 km). This is the first phase, estimated to cost €16.5 million, of a broader capital investment plan for the urban road infrastructure which also includes construction of the 1st Transversal Road (3.8 km). The project will be implemented through the Sarajevo Canton Roads Directorate. The main transition impact potential in the proposed project, when approved by the EBRD’s Board of Directors, will derive from assistance provided for the introduction of performance based management and maintenance road (PMMR) contracts, and from assistance with transformation of the current ministerial department into a separate roads administration (e.g. fund or agency). The Borrower is Bosnia and Herzegovina. Sarajevo Canton is the Beneficiary. The Sarajevo Canton Roads Directorate, currently a department in the Sarajevo Canton Ministry of Transport, will manage and implement the project. The EBRD is considering providing a €16.5 million sovereign loan. €25.5 million. Categorisation and justification The Project has been categorised A. An ESIA is required in accordance with Appendix 1 of the 2008 EBRD Environmental and Social Policy. Information reviewed Independent consultants undertook a review of the existing project documentation including the EIAs, land acquisition plans, permitting and design documentation for each road section. As a Social Impact Assessment (SIA) is not required under national regulatory requirements, the Consultant carried out a census and socio-economic survey in the Project affected areas. Environmental and Social issues Air quality, noise and vibration and social issues were not adequately assessed in the existing project documentation so an ESIA Addenda (ESIAA) has been provided including additional information on these issues. The non technical summary, ESIAA and supporting local EIA’s have been disclosed to the public as part of the ESIA package of information available on the Project website The main impacts of the project are expected to be: Proposed mitigation measures have been included in the ESIAA. Also a separate Stakeholder Engagement Plan (SEP) with a grievance mechanism has been prepared and a number of public meetings will be organised as part of a consultation programme. Land Acquisition, Involuntary Resettlement and Economic Displacement The project shall require in total the resettlement of 175 households and 42 businesses. The main gaps between local legislation and EBRD requirements which are addressed through the Resettlement and Compensation Framework are: Environmental or social opportunities The project is expected to decrease traffic congestion; improve of living conditions by achieving the optimal traffic flow reducing noise and air emissions; reduce fuel use and improve accessibility with Sarajevo. Environmental and Social Action Plan An Environmental and Social Action Plan (ESAP) has been developed and disclosed for the Project to address issues identified during the due diligence. There is an Environmental and Social Impact Assessment available for this project. Pre-signing €150,000 for Environmental and Social Impact Assesment Study. Post-signing The Project financed the widening of two key road sections and the Stup interchange and on the Southern Longitudinal Road, thereby contributing to improving the traffic through Sarajevo city centre. Works were carried out under three construction contracts awarded under a fully open and competitive tendering procedure, and were supervised by a loan funded engineer. Despite some delay and cost overrun, project completion took place in November 2018 and has since then contributed actively to improved traffic flows. The project ensured adherence to strict environmental and social standards. The Company fully implemented the Environmental and Social Action Plan, following a donor-funded Environmental and Social Impact Assessment. A Stakeholder Engagement Plan (SEP) with a grievance mechanism was also prepared and a number of public meetings were organised as part of a consultation programme. Actions were taken to resolve issues raised during the project implementation relating to resettlement and nuisance impacts as a result of the works. As part of Transition Impact, the Project intended to introduce Performance-based Management and Maintenance of Roads (PMMR) contracts with the aim to improve incentives, cost efficiency and budget management whilst introducing the private sector in the provision of road maintenance services. It was also intended to further enhance management of the sector by transforming the Sarajevo Canton Road Directorate into a Road Agency. The Project achieved some of these objectives with the first pilot PMMR being signed in 2013, whereas further progress with regards sector reform remains subject to ongoing discussions with the Sarajevo Canton authorities. |
Location
| Not available for this record. |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects
- Auburn Avenue Historic and Cultural Information Project
- M.L. King Jr. Dr. Cycle Track
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29