SARAJEVO W/SUP.&SEWERAGE
One of 157 projects Taiyo tracks in Yugoslavia, former.
Source: World Bank Group
The project would provide the facilities needed to improve the water supply system and abate water pollution in the city. The water supply and sewerage systems would be rehabilitated and expanded and a sewage treatment plant would be constructed. Essential features of the project are: (a) Water Supply: (i) construction of an infiltration gallery, reservoirs and pumping stations, and expansion of e
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Commercial, Government, Residential
- Location
- Macedonia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SARAJEVO W/SUP.&SEWERAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide the facilities needed to improve the water supply system and abate water pollution in the city. The water supply and sewerage systems would be rehabilitated and expanded and a sewage treatment plant would be constructed. Essential features of the project are: (a) Water Supply: (i) construction of an infiltration gallery, reservoirs and pumping stations, and expansion of existing reservoirs and pumping stations, (ii) installation and replacement of water mains and distribution pipes, and replacement of obsolete service connections, (iii) installation of a control system and master meters, (iv) hydro-geological studies to prepare a water resources master plan, (v) construction of headquarter's offices and supply of office equipment, and (vi) engineering services for designs, supervision, project administration and training. (b) Sewerage: (i) construction of collectors and main sewers and replacement of worn-out sewer laterals and service connections, (ii) construction of sewage treatment facilities (including a pilot plant for experimentation to attain optimal utilization of the main plant), sludge filters and facilities for disposal of sludge, and (iii) engineering services for designs, supervision, project administration and training. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Macedonia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
