logo

Saramacca Canal System Rehabilitation Project

Sector: Water Supply and Storage • Location: Suriname

Source: World Bank Group

Project
Active

The objective of the Saramacca Canal System (SCS) Rehabilitation Project for Suriname is to reduce flood risk for the people and assets in the greater Paramaribo area and improve the operation of the Saramacca Canal System. The project has four components. (1) Improving the drainage infrastructure component will finance (a) rehabilitation of the sluices and locks and canal re-profiling and clearin

Status
Prospective
Sector
Water Supply and Storage, Automotive, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government
Location
Suriname
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Saramacca Canal System Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Saramacca Canal System Rehabilitation Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Suriname. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Saramacca Canal System (SCS) Rehabilitation Project for Suriname is to reduce flood risk for the people and assets in the greater Paramaribo area and improve the operation of the Saramacca Canal System. The project has four components. (1) Improving the drainage infrastructure component will finance (a) rehabilitation of the sluices and locks and canal re-profiling and clearing and (b) pilot interventions on selected critical secondary and tertiary canals. (2) Strengthening the Saramacca Canal System component will finance TA for updating of norms and guidelines for drainage management, drainage infrastructure asset management platform, and institutional support for a possible SCS platform. (3) Providing a contingent emergency response component will finance the implementation of emergency works, rehabilitation, and associated assessments in the event of a natural disaster. (4) Supporting project management and implementation component will finance the costs related to the overall project management andimplementation support, including (a) Operating costs (including staff costs and support for training on areas such as procurement, safeguards, monitoring and evaluation, technical and financial management); (b) Individual experts (including hiring specialized staff for project implementation as needed); (c) Project audit (including financial reporting); (d) Monitoring and evaluation (including the collection of socioeconomic data and support for environmental and social safeguard supervision); (e) Equipment (vehicles, furniture, and information and communication technology); and (f) Communication plan (including support for the development of a communications strategy for engaging with local communities and stakeholders).

Original sector

FY17 - Agriculture, Fishing and Forestry

Budget

Location

Country

Suriname

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Automotive, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project