Saratovskaya Hydroelectric Power Plant Upgrade
Sector: Hydro • Location: Russian Federation
Source: World Bank Group
The financing for the upgrade of the 1360MW Saratovskaya Hydroelectric power plant on Volga river in Saratov was closed in March 2014. The Saratovskaya Hydroelectric power plant was owned 100% by RusHydro. Rushydro in turn is majority owned by the state (60%).
The total cost of the upgrade - replacement of eight existing turbines with new generation hydraulic design hydro turbines by Voith Hydro
- Status
- Prospective
- Sector
- Hydro, Wind, Power Generation (CCGT), Government
- Location
- Russia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Saratovskaya Hydroelectric Power Plant Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The financing for the upgrade of the 1360MW Saratovskaya Hydroelectric power plant on Volga river in Saratov was closed in March 2014. The Saratovskaya Hydroelectric power plant was owned 100% by RusHydro. Rushydro in turn is majority owned by the state (60%). The total cost of the upgrade - replacement of eight existing turbines with new generation hydraulic design hydro turbines by Voith Hydro – was estimated at USD 262 million. The financing comprised of EUR95.4m ($131.371m) 15 years term loan and a EUR94.9m ($130.682m) 14 years term loan provided by ING Group and Credit Agricole. |
Original sector | Energy |
Budget |
Location
Country | Russia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Power Generation (CCGT), Government |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Russian Federation
- Territorial Generating Company 4 (TGK-4)
- Territorial Generating Company TGK-8
- Territorial Generating Company TGK -6
- Wholesale Generating Company OAO OGK-3
- Blagoveshchensk Municipal Utility complex (electricity, water, heating)
- Territorial Generating Company TGK-2
- Territorial Generating Company TGK-5
- Saratovskaya Hydroelectric Power Plant Upgrade
