logo

Sardar Sarovar CADWM Project

Sector: Water Supply and Storage • Location: Kevadiya, Gujarat, India

Source: India Investment Grid (IIG)

Project
Closed

Information Narmada and Water Resources, Water Supply and Kalpsar Department-GJ has come up with Sardar Sarovar CADWM Project with a ticket size of 6670.31 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project was included for a total cost of Rs 5021.76 crore

Project Information FAQ

Project Information

5 Q
The project “Sardar Sarovar CADWM Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kevadiya, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Narmada and Water Resources, Water Supply and Kalpsar Department-GJ has come up with Sardar Sarovar CADWM Project with a ticket size of 6670.31 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project was included for a total cost of Rs 5021.76 crore, with CA component of Rs 2510.88 crore, to complete the CADWM works in balance CCA of 1363.86 th. ha. The revise project cost is Rs. 3905.67 crore from 2017-18 to till date. So, net project cost is Rs. 6670.31 crore from 2015-16 to till date. Overall CA component to Rs 2991.30 cr to complete the project. The overall 2073.87 cr CA has been released [69.33 percentage], the total expenditure incurred by the State was Rs 2876.98 cr and the CCA coverage reported by the state was 1176.016 th. ha [82.66 percentage][15-16 to 22-23]. No state share under LTIF from NABARD has been availed by State. Year of Inclusion- 2004-05 [under existing scheme 2015-16] Date of Completion- March, 2025 Project Location[s]-Gujarat Project District[s]- Vadodara, Bharuch, Narmada, Panchmahal,Chhotaudepur, Gandinagar, Ahmedabad, Mahesana, Patan,Banaskantha, Botad, Surendranagar, Morbi, Rajkot, Bhavnagar, and Kutch Project CCA- 1422.65 THa. [As per revised MOU] Project Cost- Rs.5021.76 crore, Revised project cost is Rs. 3905.67 crore from 2017-18 and overall Project cost is 6670.31 Cr from 2015-16.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data