Sardar Sarovar CADWM Project
Sector: Water Supply and Storage • Location: Kevadiya, Gujarat, India
Source: India Investment Grid (IIG)
Information Narmada and Water Resources, Water Supply and Kalpsar Department-GJ has come up with Sardar Sarovar CADWM Project with a ticket size of 6670.31 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project was included for a total cost of Rs 5021.76 crore
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- Kevadiya, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Sardar Sarovar CADWM Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Narmada and Water Resources, Water Supply and Kalpsar Department-GJ has come up with Sardar Sarovar CADWM Project with a ticket size of 6670.31 INR Crores. This project in Irrigation sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The project was included for a total cost of Rs 5021.76 crore, with CA component of Rs 2510.88 crore, to complete the CADWM works in balance CCA of 1363.86 th. ha. The revise project cost is Rs. 3905.67 crore from 2017-18 to till date. So, net project cost is Rs. 6670.31 crore from 2015-16 to till date. Overall CA component to Rs 2991.30 cr to complete the project. The overall 2073.87 cr CA has been released [69.33 percentage], the total expenditure incurred by the State was Rs 2876.98 cr and the CCA coverage reported by the state was 1176.016 th. ha [82.66 percentage][15-16 to 22-23]. No state share under LTIF from NABARD has been availed by State. Year of Inclusion- 2004-05 [under existing scheme 2015-16] Date of Completion- March, 2025 Project Location[s]-Gujarat Project District[s]- Vadodara, Bharuch, Narmada, Panchmahal,Chhotaudepur, Gandinagar, Ahmedabad, Mahesana, Patan,Banaskantha, Botad, Surendranagar, Morbi, Rajkot, Bhavnagar, and Kutch Project CCA- 1422.65 THa. [As per revised MOU] Project Cost- Rs.5021.76 crore, Revised project cost is Rs. 3905.67 crore from 2017-18 and overall Project cost is 6670.31 Cr from 2015-16. |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Gujarat |
City | Kevadiya |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
