Sarimay-Djankeldy Transmission
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line. Implementation of the project shall significantly improve reliability, efficiency a
- Status
- Under Construction
- Sector
- Road, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Sarimay-Djankeldy Transmission
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line. Implementation of the project shall significantly improve reliability, efficiency and stability of the transmission network as well as quality and security of electricity supply. The Project will be implemented by JSC National Electric Grid of Uzbekistan (“NEGU”), a state power company in charge of the country’s transmission network. Attached are the following documents available in English and Russian: Download zip file in Russian Download zip file in English https://www.uzbekistonmet.uz/oz/lists/view/2100 https://www.uzbekistonmet.uz/ru/lists/view/2100 https://www.uzbekistonmet.uz/en/lists/view/2100 Azizbek Batirov Project Implementation Unit JSC National Electric Grid of Uzbekistan 42 Osiye street, Tashkent, 100084 Uzbekistan tel. +998 71 71 2366838 e-mail: sarimay.jankeldi@gmail.com And Gulyayeva Irina EBRD Tashkent Resident Office 13th floor, Banking Association of Uzbekistan 1,Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998 78-140-44-00 Environmental and social enquiries Azizbek Batirov Environmental and social safeguards specialist Email: azabotirov@gmail.com |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Uzbekistan
- Fergana Refinery Modernisation
- South-West Gissar Project
- Kandym Gas Processing Complex (KGPC)
- Second CAREC Corridor 2 Road Investment Program - Tranche 3
- CAREC Corridor 2 Road Investment Program - Tranche 2
- CAREC Regional Road Project
- Angren Power Station New Unit
- CAREC Corridor 2 Road Investment Program - Tranche 3
