logo
ProjectDisbursing

Sarimay-Djankeldy Transmission

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line.  Implementation of the project shall significantly improve reliability, efficiency a

Status
Under Construction
Sector
Road, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sarimay-Djankeldy Transmission

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sarimay-Djankeldy Transmission” is an infrastructure initiative in the Road sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

disbursing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line.  Implementation of the project shall significantly improve reliability, efficiency and stability of the transmission network as well as quality and security of electricity supply.  The Project will be implemented by JSC National Electric Grid of Uzbekistan (“NEGU”), a state power company in charge of the country’s transmission network. Attached are the following documents available in English and Russian: Download zip file in Russian Download zip file in English https://www.uzbekistonmet.uz/oz/lists/view/2100  https://www.uzbekistonmet.uz/ru/lists/view/2100 https://www.uzbekistonmet.uz/en/lists/view/2100 Azizbek Batirov Project Implementation Unit JSC National Electric Grid of Uzbekistan 42 Osiye street, Tashkent, 100084 Uzbekistan tel. +998 71 71 2366838 e-mail: sarimay.jankeldi@gmail.com And Gulyayeva Irina EBRD Tashkent Resident Office 13th floor, Banking Association of Uzbekistan 1,Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998 78-140-44-00 Environmental and social enquiries Azizbek Batirov Environmental and social safeguards specialist Email: azabotirov@gmail.com

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project