logo
ProjectDisbursing

Sarimay-Djankeldy Transmission

Sector: Power Generation (CCGT) • Location: Uzbekistan

Source: European Bank for Reconstruction and Development (EBRD)

The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line.  Implementation of the project shall significantly improve reliability, efficiency a

Status
Under Construction
Sector
Power Generation (CCGT), Power Transmission, Commercial, Road, Residential
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sarimay-Djankeldy Transmission

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sarimay-Djankeldy Transmission” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

disbursing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line.  Implementation of the project shall significantly improve reliability, efficiency and stability of the transmission network as well as quality and security of electricity supply.  The Project will be implemented by JSC National Electric Grid of Uzbekistan (“NEGU”), a state power company in charge of the country’s transmission network. Download zip package in English Download zip package in Uzbek Full ESIA documentation is available locally at: Azizbek Batirov Head of Department of Ecology, Social and Land Relations JSC National Electric Grid of Uzbekistan 42 Osiyo street, Tashkent, 100084 Uzbekistan tel. +998 71 71 236 68 38 e-mail: piu.sarimay.djankeldy@gmail.com And Gulyayeva Irina EBRD Tashkent Resident Office 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998 78 140 44 00 And https://www.uzbekistonmet.uz/en/lists/view/6696 https://www.uzbekistonmet.uz/uz/lists/view/6696 Environmental and social enquiries Azizbek Batirov Environmental and social safeguards specialist Email: azabotirov@gmail.com

Original sector

Energy

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Commercial, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project