Sarimay-Djankeldy Transmission
Sector: Power Generation (CCGT) • Location: Uzbekistan
Source: European Bank for Reconstruction and Development (EBRD)
The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line. Implementation of the project shall significantly improve reliability, efficiency a
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Road, Residential
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Sarimay-Djankeldy Transmission
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails a loan to finance construction of (i) a c. 125 km 500 kV transmission line in Uzbekistan between the settlements of Sarimay (Khoresm region) and Djankeldy (Bukhara region), and (ii) a c. 10 km 500kV transmission line connecting a new 500kV open switchgear with the 500kV Navoi transmission line. Implementation of the project shall significantly improve reliability, efficiency and stability of the transmission network as well as quality and security of electricity supply. The Project will be implemented by JSC National Electric Grid of Uzbekistan (“NEGU”), a state power company in charge of the country’s transmission network. Download zip package in English Download zip package in Uzbek Full ESIA documentation is available locally at: Azizbek Batirov Head of Department of Ecology, Social and Land Relations JSC National Electric Grid of Uzbekistan 42 Osiyo street, Tashkent, 100084 Uzbekistan tel. +998 71 71 236 68 38 e-mail: piu.sarimay.djankeldy@gmail.com And Gulyayeva Irina EBRD Tashkent Resident Office 13th floor, Banking Association of Uzbekistan 1, Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998 78 140 44 00 And https://www.uzbekistonmet.uz/en/lists/view/6696 https://www.uzbekistonmet.uz/uz/lists/view/6696 Environmental and social enquiries Azizbek Batirov Environmental and social safeguards specialist Email: azabotirov@gmail.com |
Original sector | Energy |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Road, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
