Sarroch Refinery

Sector: Chemical (Industrial) • Location: Thailand

Source: Hydrocarbon Technology

Project
Closed

Sarroch refinery is about 20km south of Cagliari on the south-western coast of Sardinia. Owned by Saras, it has the highest production capacity of any Mediterranean refinery and a refining capacity of about 15 million tons per year, the equivalent of 15% of the total capacity of Italian refineries. The refinery has a high processing capacity and structural complexity. Liquefied petroleum gas (LPG)

Project Information FAQ

Project Information

3 Q
The project “Sarroch Refinery” is an infrastructure initiative in the Chemical (Industrial) sector, located in Thailand. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Sarroch refinery is about 20km south of Cagliari on the south-western coast of Sardinia. Owned by Saras, it has the highest production capacity of any Mediterranean refinery and a refining capacity of about 15 million tons per year, the equivalent of 15% of the total capacity of Italian refineries. The refinery has a high processing capacity and structural complexity. Liquefied petroleum gas (LPG), gasoline and diesel form more than 80% of the project’s output. Medium distillates, mainly diesel, make up about 40% of the output. The refinery’s production in 2009 was expected to be 13.8Mt to 14Mt. Major maintenance activities took place at the refinery during the first half of 2009. The refinery’s tank farm will also be expanded. Site and construction The refinery is within easy reach of European and north African countries in the central western Mediterranean. The site, which is close to Polimeri Europa and Sasol Italy, also helps align refining operations with petrochemical production. Angelo Moratti decided the site would be a strategic location for a refinery in 1962. Construction of the refinery plants started in 1963 and an atmospheric distillation unit, three desulphurisation plants and a marine terminal were also installed. Refining work started in 1965. In 2006 the company planned a three-year investment programme of about EUR600m staring from 2006 to maximise operations at the refinery. The conversion capacity was improved in 2006, as planned. During the second half of 2006 development of two processing units started, enabling the refinery to comply with directives on environmental performance. In 2007 the refinery continued maintenance operations. In April 2008 the company concluded the maintenance cycle, including the visbreaking, alkylation and mild-hydrocracking units. Extension A new gasoline desulphurisation unit was built in 2008. The unit was constructed to allow the refinery to meet the new EU specification of 10ppm sulphur in commercial gasoline. The construction was completed before the law came into effect from January 2009. The construction of a tail gas treatment and sulphur recovery plant was also completed in 2008. In 2000 a plant to gasify heavy refining distillates and generate heat and electricity simultaneously with the use of combined-cycle technology was built at the refinery. The 551MW integrated gasification combined cycle (IGCC) plant has been producing electricity from synthetic gas since September 2000. The refining cycle integrated with the IGCC plant enhances the conversion of raw materials into finished oil products and energy. Contracts Foster Wheeler secured an engineering and procurement contract from Saras in May 2006. The contract included work on a new hydro desulphurisation unit and two tail gas treatment units at the refinery. In March 2008 the engineering, procurement and construction management (EPCM) contract for renovating a mild hydrocracking unit at the refinery was awarded to Foster Wheeler. The contract was part of the refinery’s planned upgrade to enhance its unconventional crude processing capability. Processing Processing facilities at Sarroch include three atmospheric distillation units, vacuum distillation, visbreaking, distillate cracking FCC, cat reforming, distillate hydrocracking, five hydrotreating units, alkylation, oxygenates and a BTX plant. Environmentally friendly technology The refinery’s sulphur dioxide emissions during 2006-2008 fell by approximately 30% in comparison with the four-year average recorded during 2000-2004. The improvement was due to technical and management initiatives taken by the company. The initiatives included equipping the refinery with advanced technology to make it more environmentally friendly. New proposals Saras’s future investment and development plan (2008-2011) for the refinery focuses on increasing conversion capacity and improving energy efficiency and performance. Saras plans to improve the refinery performance mainly through process optimisation and increasing throughput.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data