Saskatchewan Science Centre - Renovations, Repairs and Upgrades to the Facility to Enable Re-opening with COVID-19 Health & Safety
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The Project will repair, upgrade, and renew the aging infrastructure (exhibits, flooring, bathrooms, and public areas) within the facility. The project is ’shovel-ready’ and will support economic recovery. Fully re-opening the facility is a challenge and will occur slowly to ensure the health/safety of visitors/employees. All bathroom renovations will include non-touch faucets and soap dispensers,
- Status
- Closed
- Sector
- Commercial, Residential, Government
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Saskatchewan Science Centre - Renovations, Repairs and Upgrades to the Facility to Enable Re-opening with COVID-19 Health & Safety
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will repair, upgrade, and renew the aging infrastructure (exhibits, flooring, bathrooms, and public areas) within the facility. The project is ’shovel-ready’ and will support economic recovery. Fully re-opening the facility is a challenge and will occur slowly to ensure the health/safety of visitors/employees. All bathroom renovations will include non-touch faucets and soap dispensers, will be wheelchair accessible and gender neutral where feasible. The carpeting within the facility and on the exhibit floors will be removed/replaced with products easier to maintain, clean, and ensure the safety of visitors. A non-slip flooring will be used on the exhibit floor where slipping hazards are a current concern. Renovations will include painting/repairs to all public spaces. Main entrance and retail space renovations will ensure greater accessibility for visitors/staff. New seating/flooring in the theatre will accommodate the need for cleaning/sanitizing on an ongoing basis. The box office/concession will be renovated to enable increased accessibility for staff/guests. Some exhibits have been permanently removed; no longer meeting COVID-19 safety protocols, others will need to be modified and/or replaced to allow for physical distancing/cleaning protocols required for high touch displays. The Science Centre building is owned by SaskPower; however, the Saskatchewan Science Centre has a long term lease (to 2037); owning the assets within the facility (e.g. exhibits) and operates the facility. |
Original sector | Community, Culture and Recreation |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Winnipeg East District Police Station
- Illusuak Cultural Centre
- Lowe's Home Improvement Warehouses
- Manitoba Hydro High Voltage Test Facility
- Transport and Rescue Squadron Fixed Wing Hangar - 19 Wing CFB 422 Comox
- Merit Contractors Association Tenant Improvement
- Coca-Cola Centre
- Leaside Village at 85 Laird Drive
