Interconnection of the Awasis 10 MW Solar photovoltaic (PV) generation facility to the SaskPower system by connection to an existing 25 kilovolt (kV) distribution line which is in close proximity to the Awasis site. This will connect the Awasis facility to the existing Regina South substation which is approximately 10 kilometres (km) away from the generation facility. Upgrades are required to the

Project Information FAQ

Project Information

5 Q
The project “SaskPower - Awasis 10 MW Solar Interconnection” is an infrastructure initiative in the Solar sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Interconnection of the Awasis 10 MW Solar photovoltaic (PV) generation facility to the SaskPower system by connection to an existing 25 kilovolt (kV) distribution line which is in close proximity to the Awasis site. This will connect the Awasis facility to the existing Regina South substation which is approximately 10 kilometres (km) away from the generation facility. Upgrades are required to the distribution line and the substation infrastructure to facilitate connection of the new generation facility. The Awasis 10MW Solar Project recipients are responsible for development, construction, commissioning and operation of the generation facility as outlined in the Power Purchase Agreement (PPA). SaskPower is responsible for the interconnection of this facility to the SaskPower grid and subsequent purchase of power from Awasis as per the terms and conditions outlined in the PPA.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data