logo
ProjectCompleted

SaskPower - Pesakastew 10MW Solar Interconnection

Sector: Solar • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Interconnection of the Pesakastew 10 MW Solar photovoltaic (PV) generation facility proposed by the First Nations Power Authority (FNPA) / Pesakastew Solar to the SaskPower system. Pesakastew Solar is a partnership between Natural Forces, Star Blanket Cree Nation and George Gordon First Nation. The Pesakastew team is responsible for development, construction, commissioning and operation of the ge

Status
Closed
Sector
Solar, Power Generation (CCGT), Government
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about SaskPower - Pesakastew 10MW Solar Interconnection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SaskPower - Pesakastew 10MW Solar Interconnection” is an infrastructure initiative in the Solar sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Interconnection of the Pesakastew 10 MW Solar photovoltaic (PV) generation facility proposed by the First Nations Power Authority (FNPA) / Pesakastew Solar to the SaskPower system. Pesakastew Solar is a partnership between Natural Forces, Star Blanket Cree Nation and George Gordon First Nation. The Pesakastew team is responsible for development, construction, commissioning and operation of the generation facility as outlined in the PPA. SaskPower is responsible for the interconnection of this facility to the SaskPower grid and subsequent purchase of power from Pesakastew as per the terms and conditions outlined in the Power Purchase Agreement (PPA). 10 MW solar project located approximately 3 km south west from the city of Weyburn within the Rural Municipality of Weyburn (No. 67). Interconnection of the generation facility is proposed to be accomplished by connection to an existing 25 kilovolt (kV) overhead distribution line in close proximity to the Pesakastew site (SE13-8-15-W2M). This will connect the Pesakastew facility to the existing Weyburn substation (SW18-8-14-W2M) directly east of the solar generation facility. Upgrades are required to the distribution line and the substation infrastructure to facilitate connection of the new generation facility.

Original sector

Green Energy

Budget

Location

Country

Canada

State

Saskatchewan

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project