Satellite Transit System Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Timely and cost-effective renewal and replacement of Satellite Transit System (STS) is required by 2030-2035 to continue operation and maintain efficient airport. The scope include replacement of end-of-life STS vehicles, structural rehabilitation of the current STS tunnels, and construction of a new north pedestrian connector (NSAT to Concourse D).
- Status
- Prospective
- Sector
- Automotive, Commercial, Telecommunications, Airport, Government, Tunnel
- Location
- Seatac, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Satellite Transit System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Timely and cost-effective renewal and replacement of Satellite Transit System (STS) is required by 2030-2035 to continue operation and maintain efficient airport. The scope include replacement of end-of-life STS vehicles, structural rehabilitation of the current STS tunnels, and construction of a new north pedestrian connector (NSAT to Concourse D). |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seatac |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Telecommunications, Airport, Government, Tunnel |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
