Saudi Arabia and Jordan Interconnector project
One of 2 projects Taiyo tracks in Jordan, Saudi Arabia.
Source: InfraPPPWorld
The project involves the development of a transmission interconnector that connects the power grids of Jordan and Saudi Arabia via a 164-km-long line from Qurayyat (Saudi Arabia) to East Amman (Jordan). The project includes the construction of a high-voltage direct current converter station, a 400-kV gas-insulated switchgear substation, and a 400-kV overhead transmission line.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Power Transmission
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Saudi Arabia and Jordan Interconnector project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in tender |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a transmission interconnector that connects the power grids of Jordan and Saudi Arabia via a 164-km-long line from Qurayyat (Saudi Arabia) to East Amman (Jordan). The project includes the construction of a high-voltage direct current converter station, a 400-kV gas-insulated switchgear substation, and a 400-kV overhead transmission line. |
Original sector | Energy |
Location
Country | Jordan |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project