Saudi Arabia Grid Infrastructure Projects
The owner, status and timeline of this project. A free account opens every field.
Source: Scanx
L&T's Power Transmission & Distribution vertical secured significant orders in Saudi Arabia for two major grid infrastructure projects: construction of a 380/33 kV Gas Insulated Substation and construction of 380 kV Overhead Transmission Links spanning over 420 kilometers. These projects are part of Saudi Arabia's National Renewable Energy Programme to upgrade the electricity grid for renewable en
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about Saudi Arabia Grid Infrastructure Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | L&T's Power Transmission & Distribution vertical secured significant orders in Saudi Arabia for two major grid infrastructure projects: construction of a 380/33 kV Gas Insulated Substation and construction of 380 kV Overhead Transmission Links spanning over 420 kilometers. These projects are part of Saudi Arabia's National Renewable Energy Programme to upgrade the electricity grid for renewable energy support. |
Original sector | Power Transmission & Distribution |
Budget |
Location
Country | Saudi Arabia |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-10-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
